calculator | EPC SOLUTIONS LLC

calculator

Print this page
Pay Less, Pay Smart - Affordable Solar(Building Future)
What To Pay
Sanction Load (In kW) 0 Shed-free area (Sq. Mtr) requirement as per Allowable Load
Allowable Load (In kW) 0 Min: 1 ; Max: 1000 - kW
Shedfree Roof Available (Sq. Mtr) # If Roof area is an input than automatically same has to put taken in Allowable Load as input.
Max kW Installed on Roof Input   0.00  
System Cost / kW 65,000.00 (PONDER 70000 Is Maximum Considerable Amount For Subsidy Upto 10kW System, While Above 10 To 100kW Its 65000 And Above 100kW To 500kW - 60000)- All Amount are excluding Services, Taxes and Duties
 
Net Cost 0.00 Inclusive of All Taxes & Duties, etc. with no Hidden Cost.
States With 30% Subsidy - Restout as Stated Below (Only For Residential/ Hospital/ Institutional), Only 80% of Connected Load Can be Subscribed
Applicable Solar Cost For Subsidy 0

WHY US ?
In the World we only offer 25 Yrs System Warrenty at No Hidden Cost.
Subsidy Is Subject To Government T&C and Will Come As Per Their Own Descrition, While In Our Offer We Ask Customer To Pay Only Net Amount After Susidary Deduction while we will claim and settle Susbsidary at our end.
In states with 30% Subsidy, we invest our money in your project to support your envirnoment friendly step. Hereunder we will claim Subsidy and upfront pass the same to you as Rebate, thus you only pay upfront the NET AMOUNT. While the Subsidy whenever will come we will collect from your goodself for which we take BG/ LC/ Draft.
For Ex. : 10kW Residential Customer in 30% Subsidy State Has to Pay Upfront 486000/- INR instead 675000/- INR, Subsidy amount of 189000/- INR we will collect when it will be released by the Govt.
WE HELP IN FINANCING

Net Cost With Applicable for Subsidy 0
Applicable Subsidaries 30%
Net Payment 0
Net Subsidy (After Subsidy) 0 States With 70% Subsidy For North Eastern States including Goa, Telangana, Assam, Purucherry, Arunachal Pradesh, Sikkim, Uttarakhand, Himachal Pradesh, Lakshdeep, Manipur, Mizoram, Nagaland, Tripura, Meghalaya, Dadar & Nagar Haveli, Daman & Diu, Jammu & Kashmir and Lakshadweep , Andaman & Nicobar Islands (Only For Residential/ Hospital/ Institutional), Only 80% of Connected Load Can be Subscribed
Per kW 0

PAYBACK CALCULATION :::: Pay Less, Pay Smart - Affordable Solar (Building Future)
To Pay After Subsidy
O&M Cost @ 25 Yrs (Incl. Escalation In 25 Yrs.)
Payable O&M Amount Per Year
Total Cost In 25 Yrs
kWH Generated/ Day 0
kWH Generated/ Month 0
kWH/ Year 0
kWH in 25 Yrs (With 20% Depreciation) 0
Project Selected In State -
Type Of Load Selected -
kWh Amount
Net Bill Per Month
Net Bill Per Year
Agreegated Bill Saving in 25 Yrs (With 15% Levelised Tariff)
Net Metering Export kWH/ Year (As Day Consumption is Less In Residence)
kWH/ Year Amount for Exported Energy  
Agreegated Earning from Energy Export in 25 Yrs (With 10% Panel Av. Depriciation)
Pay Back (Yrs.)
Rate On Investment
Pay Back (Yrs.) With O&M AMC
Rate On Investment With O&M AMC
Carbon dioxide emissions mitigated in Lifetime (In Tons)
This installation will be equivalent to planting

CONTACT US : DIRECTOR@EPCSOLUTION.ORG / SUPPORT@EPCSOLUTION.ORG
MOB. NO. +91 8800990802 / +91 8368852438 | GST NO. 07AAECV1189L1ZW
www.epcsolution.org | www.epcsolutions.in | www.oatlantic.com | www.oatlantic.in

©2016 EPC SOLUTIONS. All Rights Reserved.

About Us
Contact Us